SURVEYING AND ENVIRONMENTAL IMPACT ASSESSMENT

SURVEYING AND ENVIRONMENTAL IMPACT ASSESSMENT

The use of GPS and total station to conduct road survey, cut and fill a level survey, slope calculations at the top limit level, the use of automatic and dumpy levels for a high precision level survey, the establishment of formation and excavation level marks, Road gradient calculations, setting out access roads, culverts and bridges. We perform all types of survey operations for Infrastructure and Engineering department such as Production of building plans, production of layout plan for location identification, the establishment of control points used for survey operations and setting out. Using survey equipment such as Leica and Topcon total stations, Leica and Topcon GPS, both Grade and plain rotating lasers Digital and Optical (dumpy) levels for executing different kinds of surveying activities.

ENVIRONMENTAL IMPACT ASSESSMENT
  • Prepare plans for resettlement and compensation
  • Preparation of Environmental Assessment Report